• PORTFOLIO
  • ABOUT

CESAR CABALLERO

BIM/VDC Manager

  • PORTFOLIO
  • ABOUT

Unilever Manufacturing Plant BIM Management

-Revit and Navisworks-based architectonic coordination of a detergent manufacturing plant. 179757 sqft (16700 sqm).
-Building schedules and quantities. Coordination with structural, mechanical and electrical disciplines. Interference checks and resolution.
-Research and management of product distributors that comply with LEED credits IEQc4.1, 4.2, 4.3, 4.4. (2013)
-Daylight simulations using 3ds MAX for LEED credits IEQc8.1 and 8.2. (2013) 
-Research, translation and technical specification writing.

UNILEVER4.jpg
UL 7.jpg
UNILEVER2.jpg
IMAGEN-PLANTA-1.jpg
IMAGEN 1.jpg
Unilever-ppal.jpg
UL 3.jpg
Webp.net-gifmaker (25).gif
UNILEVER3.jpg
IMAGEN 2.jpg
UNILEVER5.jpg
fab0827-1000.jpg

© 2025 Cesar Caballero